伊人免费视频-伊人免费视频二-伊人免费视频网-伊人免费在线观看高清版-伊人欧美

-Language-
Access control system installation specification design
2018-11-06 17:14

The wiring control specification of Access control system

1. Access control system centralized power supply: Access control system lines are divided into two types: power line, signal line. The power cord mainly supplies power to the electric lock and the card reader. Under normal circumstances, the distance RVVP*0.5MM wire type is required within 50 meters, and the RVVP*1.0MM line is required for the distance of 50-100 meters. The signal line is a card reader communication signal line, an exit button control line, and a door magnetic signal line. Use twisted pair cable or shielded twisted pair cable and RVVP cable. Each Access control system is routed according to the equipment used.

Access control system installation specification design

2. Access control system power supply (remote control) The line only has signal lines, generally RVVP lines, twisted pairs, shielded twisted pairs. The signal line is divided into a card reader communication line, an electric lock control signal line, an exit button line, a door magnetic signal line, and various data lines. All power supplies are powered by an access control.

3. There is a breakpoint in the middle of the line of the Access Control system. The power-off line needs to be docked and insulated.

4. Line measurement: Test the line before wiring to avoid breakpoints in the middle of the line. After the line is laid, test the line immediately to test whether there is any break point in the wiring process. When installing the equipment, the same It is necessary to test the line to avoid damage to the line caused by other constructions after the wiring is installed.

5. Shielding treatment The line should be weakened by the wire slot. If there is no weak wire slot, please take the pvc bushing. If you can't take the pvc bushing, you need to leave the strong electric power to the maximum extent and all the wires are shielded and grounded.

Access control system

The Access control system before the installation of debugging

The Access control system needs to check the various devices in the access control before installation. Before starting, you need to test all the devices one by one to check whether the device is running normally and avoid hidden dangers during installation.

Steps for debugging: First test the access control power supply to avoid unstable power supply. The access control system is connected to the device for a unified power-on test. After power-on, each device should be tested for normal operation. If it is normal, it can be debugged as a whole.

The debugging of the Access control system needs to record the problems faced, organize the problems encountered in debugging, and give feedback to the manufacturer to obtain technical guidance.

Finally, with the completion of the debugging phase, you can actually install the Access control system to the access channel.


Keywords: access control system. http://m.coreimage.cn/index_en.html

Stephanie Stephanie Stephanie Ellie Ellie Ellie Victoria Victoria Victoria Olivia Olivia Olivia Isabella Isabella Isabella Jayden Jayden Jayden Lucas Lucas Lucas Dylan Dylan Dylan Ryan Ryan Ryan Noah Noah Noah

Sweep the concern Yingze electronic official WeChat

x
Sample Apply
※ Please fill in your information, our company will deal with your problem as soon as possible.
主站蜘蛛池模板: 香蕉视频 在线播放| 久久99视频精品| 国产精品一区二区丝瓜| 精品国产免费久久久久久| 一级日韩片| 色片免费| 黄色网址在线免费看| 日本中文字幕有码| 中文区永久区乱码六区| 亚洲精品日韩中文字幕久久久| 国产精品免费观看| 国内拍拍自拍视频在线观看| 中国人xxxxbbbb国产| 久久精品国产丝袜| 免费一级国产大片| 国产精品黄色片| 国产午夜精品久久久久免费视 | 日韩精品中文乱码在线观看| 18年大片免费在线观看| 中国一级毛片aaa片| 国内嫩模私拍精品视频| 2020国产成人免费视频| 欧美日韩亚洲综合在线一区二区| 久久99网站| 亚洲精品一区二三区在线观看| 青草国产在线视频| 视频在线观看一区二区| 国产免费大片| 午夜性刺激在线观看视频| 中国性视频| 1024你懂的国产| 91综合久久| 日本黄色免费大片| 成年人在线观看视频网站| 国产剧情毛片| 97精品国产91久久久久久| 另类欧美日韩| 一个色综合网| 久久911| 久草在线免费资源站| 亚洲免费视频观看|